• Manifest Group (opens in a new tab)
  • Projects
  • News
  • Careers
  • Contact
EL
  • Manifest Group
  • Projects
  • News
  • Careers
  • Contact
EL
  • Building
  • Energy
  • Infrastructure
  • Our team
  • Purpose and priorities
  • Our principles
  • Sustainability
  • Equality, diversity and inclusion
  • Health, safety and wellbeing
  • Social responsibility

We build complex projects with certainty. Across building, energy and infrastructure, we deliver lasting value.

What we do

  • Building
  • Energy
  • Infrastructure

Who we are

  • Our team
  • Purpose and Priorities
  • Careers

Projects

  • All Projects
  • Featured Projects

News

  • News
  • Articles

Contact

Neratziotissis 115151 24 Marousi, Greece (opens in a new tab)+30 211 345 6700info@manifest.gr

© 2026 Manifest Construction | Powered by Think Plus

Privacy | Terms | Cookies

Project

AkzoNobel (Vivechrom)

AkzoNobel engaged Manifest Construction for the energy upgrade of its building's central air-conditioning, including the fan coil units in the interior spaces. The aim was to replace ageing equipment with a new, more efficient cooling and heating system.

LocationAttica
IndustryPaints and coatings

What we did

  • Removal of the existing units and fan coils.
  • Installation of a new Midea heat pump of about 90 kW cooling capacity.
  • New plant room pipework and changes in the boiler room.
  • New pipe insulation.
  • Installation of 19 new floor-standing fan coils with thermostats.
  • Testing and start-up of the system.

Key takeaways

  • Replaced chillers, one of which was already out of service.
  • A new, more energy-efficient air-conditioning system.
  • Local temperature control in each space through new thermostats.
  • Existing underground pipe runs reused, with no excavation.
  • Works in weekday morning shifts with minimal disruption.

Press contact

Telephone+30 211 345 6700
Press officeinfo@manifest.gr