Dromeus Capital commissioned Manifest Construction to strip out and fully fit out the first floor of the office building at 16 Kifisias Avenue and Chalepa Street in Marousi. The goal was a modern, open-plan 465 m² office space, ready for occupation.
LocationMarousi
IndustryReal estate
Duration5 months
What we did
Strip-out of partitions, aluminium frames, glazing and old MEP in ten working days.
Small-scale building permit for the fit-out works.
Mineral-fibre ceilings, laminate flooring and painting across 465 m².
New LV panel, power and UPS for 20 workstations, Cat 6 cabling and 27U rack.
VRV air conditioning with ten indoor units and heat-recovery ventilation.
Fire detection, LED and emergency lighting, access control and kitchen counter.
Key takeaways
An outdated floor turned into a modern open-plan office.
One contractor from strip-out to final handover.
Energy-efficient VRV cooling and heating with heat recovery.
Power and data infrastructure ready for 20 workstations.