• Manifest Group (opens in a new tab)
  • Projects
  • News
  • Careers
  • Contact
EL
  • Manifest Group
  • Projects
  • News
  • Careers
  • Contact
EL
  • Building
  • Energy
  • Infrastructure
  • Our team
  • Purpose and priorities
  • Our principles
  • Sustainability
  • Equality, diversity and inclusion
  • Health, safety and wellbeing
  • Social responsibility

We build complex projects with certainty. Across building, energy and infrastructure, we deliver lasting value.

What we do

  • Building
  • Energy
  • Infrastructure

Who we are

  • Our team
  • Purpose and Priorities
  • Careers

Projects

  • All Projects
  • Featured Projects

News

  • News
  • Articles

Contact

Neratziotissis 115151 24 Marousi, Greece (opens in a new tab)+30 211 345 6700info@manifest.gr

© 2026 Manifest Construction | Powered by Think Plus

Privacy | Terms | Cookies

Project

Nestlé Oinofyta

Nestlé Hellas awarded Manifest Construction the interior refit of the changing rooms and a new car shade at its Oinofyta factory. The aim is to improve staff facilities and conditions without disrupting the plant's round-the-clock operation.

LocationOinofyta
IndustryFood manufacturing
Duration3 months
People on site10

What we did

  • Strip-out, cable routing and self-levelling screeds.
  • 2+2 drywall partitions with moisture-resistant boards and 60x60 porcelain tiling.
  • Showers, WCs and an accessible WC, new doors and a 60-minute fire door.
  • Metal-mesh ceilings, LED lighting, benches and lockers.
  • A new row of galvanised car shades with fire-retardant mesh.
  • A techno-economic heating and cooling study: gas boiler versus an LG VRF of about 60 kW.

Key takeaways

  • Modern, practical changing rooms for production staff.
  • Accessibility through an accessible WC.
  • Shaded parking at the factory entrance.
  • A documented case for lower running costs and lower heating emissions.
  • Works carried out under Nestlé's contractor safety rules.

Press contact

Telephone+30 211 345 6700
Press officeinfo@manifest.gr